Finished electrical control PCB redesign and ordered new PCB. Tested
stabilator trim servo travel to set linkage length;
Pin 1=+12V, Pin 2=GND - servo moved downward, stopped at ~0.42" above
case
Pin 1=GND, Pin 2=+12V - servo moved upward, stopped at ~1.55" above case
Returned servo to center of travel, leaves ~3.3" center-to-center
linkage. Cut linkage rod to length and installed linkage.
5
No work.
6
No work.
7
No work.
8
Assembled fuel shut-off valve fittings to valve and installed valve
in panel. (Those are nitrile glove fingers over the fittings to keep
dirt out of the valve.) Did some practice with the micro-stop on scrap
and then installed countersunk rivets on forward longeron/gusset.
9
Investigated possible mounting locations for ELT and its antenna.
Will probably use baggage deck bay like demo plane, and put antenna on
tailcone beyond canopy travel.
10
Installed eye bolts and rudder pedal springs. Had to use 2 thick
washers vice 1 thin washer called for on eye bolts. Installed tang for spring
on rudder pedal assemblies, had to add one thick washer.
11
Started trimming heatsinks for LED landing lights - need to remove
outer fins on each heatsink for mounting.
12
Drilled ELT bracket mounting holes. Finish trimming one set of
heatsinks for LED lights.
13
No work.
14
No work.
15
Installed ELT mounting bracket in baggage deck area behind access
panel.