| Date |
|
| 1 |
No work.
|
| 2 |
No work. |
| 3 |
No work. |
| 4 |
Started drilling holes in lower instrument panel area for ignition
switch, headset jacks, power control unit switches, and alternator
circuit breaker. |
| 5 |
Continued work on electrical control unit. Primed roll bar. |
| 6 |
No work. |
| 7 |
Fitted electrical control unit to lower instrument panel and drilled
mounting holes. |
| 8 |
Finished lower control panel drilling. Did test fit of ignition
switch, alternator circuit breaker, and electrical control unit with
temporary placard. Drilled holes for static ports on aft fuselage just
above 5th rivet forward of bulkhead #3. (Per Ed, Rans is using the 5th
rivet hole as their new static port location.) Holding off installing
ports until get the elbow fittings for them. Drilled and tapped Dynon
AOA pitot tube for mounting in the Gretz Aero pitot tube mount. Drilling and
cut-out rear panel of electrical control unit for load connectors and
grommets.
|
| 9 |
Picked up wings and wheels/brakes kit from Fedex terminal. (13' long
crate, 8'x5' trailer, ...) Started unpacking crate. Kudos to Rans for
screwing the top on instead of stapling. |
| 10 |
No work. |
| 11 |
In what has got to be the ultimate example of the best tech support
on the planet, I got an email from Ed today letting me that someone at
Rans was looking at this website and noticed I had reversed the bulkhead
sides on the forward fuselage (see annotated picture from Ed below) when I had
started putting the forward section back together again. So, the first order
of business today was to pop those off and put them on correctly to
eliminate that particular source of embarrassment. We'll all just
pretend we didn't see that. I'm getting ready to paint that area now
that the lower panel is ready, so I am REALLY grateful to have fixed it
before that. That fiasco behind, continued the final assembly of the
electrical control unit circuit board.
|
| 12 |
Primed electrical control unit enclosure. Drilledinstrument panel
mounting holes to 5/16". Cut holes in panel for vents. |
| 13 |
Painted electrical control unit enclosure. Rearranged work area to
make room for the wing spar fit-up. |
| 14 |
Unpacked and inventoried majority of wings/wheels crate. Fitted wing
spars into spar carry-through and reamed bolt holes to 3/8". Removed
wing spars. |
| 15 |
Nearly finished wings/wheels crate inventory - can't get the last
parts out until I have somewhere flat that is long enough to put them.
Installed elbows into static ports and riveted the static ports to
fuselage. Drilled hole for 12V power outlet in lower panel. |
| 16 |
Painted lower instrument panel and side supports. |
| 17 |
No work. |
| 18 |
No work. |
| 19 |
No work. |
| 20 |
No work. |
| 21 |
Finished inventory of wings kit. Set up wing spars on sawhorses. |
| 22 |
Made panel cut-outs for ELT remote control panel, stabilator trim indicator, Dynon FlightDek 180 EFIS/EMS, and EMS alarm light. Transfer drilled wing
tie downs and bell crank attach angles to wing spars.
|
| 23 |
No work. |
| 24 |
Continued assembly and enclosure work on electrical control unit. |
| 25 |
Mounted Dynon frame to instrument panel. Started assembly of aft
inboard wing ribs (station 1-4, 5, 7). |
| 26 |
Transfer drilled aft wing rib stiffeners and gussets (left ribs for
station 1-4, 5, 7). |
| 27 |
No work. |
| 28 |
No work. |
| 29 |
Assembled front tire onto hub. (Painted with Imron courtesy of my
son, who also squeezed the rivets for the pitot mast nutplates.)
Transfer drilled aft wing rib stiffeners and gussets (right ribs for
station 1-4, 5, 7). Modified forward ribs for station 6 and 7. Prepped
both wing spars for priming. Started deburring and edge polishing of all wing
rib parts.
|
| 30 |
Continued deburring and edge polishing of all wing
rib parts. |
| 31 |
Continued deburring and edge polishing of all wing
rib parts. |