| Date |
|
| 1 |
Painted electrical control unit enclosure. |
| 2 |
Assembled electrical control unit.
|
| 3 |
Riveted radio rack to instrument panel. Started marking location for
Hobbes timer. |
| 4 |
No work. |
| 5 |
No work. |
| 6 |
Cut opening in panel for Hobbs timer.
|
| 7 |
No work. |
| 8 |
No work. |
| 9 |
No work. |
| 10 |
No work. |
| 11 |
No work. |
| 12 |
Installed radio support channels. Installed floorboard access panel
and brake line clamps. Started fabricating wiring harnesses. |
| 13 |
Drilled flap handle frame for stabilator down-bungee. Clamped piece
of predrilled wood to frame to act as drill guide rather removing frame. Started
installation of bungee.
|
| 14 |
Cut out flap handle trim. Clamped bungee and checked stick tension.
Reinstalled flap handle with trim pieces.
|
| 15 |
Filled rivets and screws on instrument panel and primed. |
| 16 |
Touched up primer on instrument panel. |
| 17 |
No work. |
| 18 |
No work. |
| 19 |
No work. |
| 20 |
No work. |
| 21 |
No work. |
| 22 |
No work. |
| 23 |
Completed prepping instrument panel for paint. |
| 24 |
No work. |
| 25 |
No work. |
| 26 |
Painted instrument panel. |
| 27 |
Working on instrument panel equipment installation and wiring. |
| 28 |
Working on instrument panel equipment installation and wiring. |
| 29 |
Working on instrument panel equipment installation and wiring. |
| 30 |
No work. |